Skip to main content
Loading…
This section is included in your selections.

(1) Full stormwater site plans shall address minimum requirements 1 through 9 (SCC 30.63A.400 through 30.63A.605). The full stormwater site plan submittal shall include both the items required by volume I, chapter 3 of the Drainage Manual and the full stormwater site plan submittal checklist items adopted by the department pursuant to SCC 30.70.030.

(2) Full stormwater site plan submittal requirements require an accurate set of plans and calculations prepared by a professional engineer licensed in Washington State. The plans shall become part of the construction documents and plans prepared for the development activity. The full stormwater site plan shall clearly indicate the nature and extent of the work proposed and how the system shall be maintained and to whom maintenance responsibility shall be assigned. (Added by Amended Ord. 10-026, June 9, 2010, Eff date Sept. 30, 2010; Amended by Amended Ord. 16-029, May 11, 2016, Eff date May 23, 2016).