(1) For any development activity or action requiring a project permit, the applicant shall submit a site development plan drawn to a standard engineering scale which includes:

(a) Boundary lines and dimensions of the subject property;

(b) Boundary lines and dimensions of the site;

(c) The topography at contour intervals of five feet unless the underlying project permit requires a lesser interval;

(d) Location, size, and type of any existing structures, cleared areas and other existing improvements;

(e) Location, size and type of all proposed development activities, activities subject to project permits and clearing;

(f) Location and description of all wetlands and fish and wildlife habitat conservation areas located on the site or within 300 feet or the width of the widest potential buffer of the site boundaries;

(g) Location of all other critical areas regulated pursuant to chapters 30.62B, 30.62C and 30.65 SCC on or within 300 feet of the site; and

(h) Location of structure setbacks as required in chapter 30.23 SCC.

(2) In addition to a site development plan the following additional information will be required where applicable:

(a) Classification of all streams, wetlands or lakes pursuant to SCC 30.62A.230 (Table 1). Classification is not required if the project permit applicant applies the maximum protection for the specific critical area as specified at SCC 30.62A.320 (Table 2);

(b) Provisions for permanent protection as specified at SCC 30.62A.160;

(c) Provisions for temporary marking on the site of all critical area protection areas, or the limits of the proposed site disturbance outside of the critical area protection areas; and

(d) A critical area study as required by SCC 30.62A.140. (Added by Amended Ord. 06-061, Aug. 1, 2007, Eff date Oct. 1, 2007; Amended by Amended Ord. 15-034, Sept. 2, 2015, Eff date Nov. 1, 2015).