Skip to main content
Loading…
This section is included in your selections.

Table 30.86.420 Plumbing Fees

COMMERCIAL PLUMBING PERMITS NOT ASSOCIATED WITH NEW BUILDING CONSTRUCTION

For plumbing permits on commercial projects not related to new building construction, the fee table in SCC 30.86.400(7) applies based on the valuation.

PLUMBING INSPECTION FEES FOR THE CONSTRUCTION OF NEW GROUP R-3 OCCUPANCIES (ONE-AND TWO-FAMILY RESIDENTIAL).

For new construction of Group R-3 occupancies, 11 percent of the building permit fee shall apply for mechanical and plumbing inspections.

The per-fixture fees below apply to: (1) standalone plumbing permits related to Group R-3 occupancies, and (2) plumbing permits associated with new commercial building construction.

FOR FACTORY-BUILT MODULAR STRUCTURES (the fee will be assessed for each fixture built into the structure by the manufacturer)

$3.50

FOR EACH:

Backflow protective devices,

$7

Industrial waste pre-treatment interceptor, including its trap and vent,

$7

Installation, alteration, or repair of water piping,

$7

Plumbing fixture,

$7

Rainwater systems-per drain (inside building) repair or alteration of drainage or vent piping,

$7

Set of fixtures on one trap (including water, drainage, piping),

$7

Trap,

$7

Water heater or vent,

$7

Water treating equipment.

$7

FOR EACH BUILDING SEWER AND EACH TRAILER PARK SEWER

$15

(Added by Amended Ord. 02-064, Dec. 9, 2002, Eff date Feb. 1, 2003; Amended by Amended Ord. 07-084, Sept. 5, 2007, Eff date Sept. 21, 2007; Amended by Amended Ord. 08-122, Nov. 10, 2008, Eff date Jan. 1, 2009; Amended by Amended Ord. 21-048, Sept. 29, 2021, Eff date Nov. 1, 2021).