Skip to main content
Loading…
This section is included in your selections.

A construction permit is required:

(1) To install, repair or modify a pipeline for the transportation of flammable or combustible liquids.

(2) To install, construct or alter tank vehicles, equipment, tanks, plants, terminals, wells, fuel-dispensing stations, refineries, distilleries and similar facilities where flammable and combustible liquids are produced, processed, transported, stored, dispensed or used.

(3) To install, alter, remove, abandon or otherwise dispose of a flammable or combustible liquid tank. (Added by Ord. 07-087, Sept. 5, 2007, Eff date Sept. 21, 2007; Amended by Amended Ord. 11-024, Aug. 3, 2011, Eff date Aug. 18, 2011; Amended by Amended Ord. 14-059, Aug. 27, 2014, Eff date Sept. 13, 2014; Amended by Amended Ord. 21-031, July 14, 2021, Eff date July 25, 2021. Formerly SCC 30.53A.344).