30.52A.030, Title (IBC 101.1)
(Added)
-
30.52A.040, Scope (IBC 101.2)
(Added)
-
30.52A.050, Intent (IBC 101.3)
(Added)
-
30.52A.060, Referenced codes (IBC 101.4)
(Added)
-
30.52A.100, General applicability (IBC 102.1)
(Added)
-
30.52A.102, Other laws (IBC 102.2)
(Added)
-
30.52A.106, Referenced codes and standards (IBC 102.4)
(Added)
-
30.52A.110, Existing structures (IBC 102.6)
(Added)
-
30.52A.120, Applications and permits (IBC 104.2)
(Added)
-
30.52A.122, Notices and orders (IBC 104.3)
(Added)
-
30.52A.124, Inspections (IBC 104.4)
(Added)
-
30.52A.126, Identification (IBC 104.5)
(Added)
-
30.52A.128, Right of entry (IBC 104.6)
(Added)
-
30.52A.130, Department records (IBC 104.7)
(Added)
-
30.52A.132, Liability (IBC 104.8)
(Added)
-
30.52A.134, Approved materials and equipment (IBC 104.9)
(Added)
-
30.52A.136, Used materials and equipment (IBC 104.9.1)
(Added)
-
30.52A.138, Modifications (IBC 104.10)
(Added)
-
30.52A.140, Alternative materials, design and methods of construction and equipment (IBC 104.11)
(Added)
-
30.52A.142, Research reports (IBC 104.11.1)
(Added)
-
30.52A.144, Tests (IBC 104.11.2)
(Added)
-
30.52A.146, Permits required (IBC 105.1)
(Added)
-
30.52A.148, Work exempt from permit (IBC 105.2)
(Added)
-
30.52A.150, Emergency repairs (IBC 105.2.1)
(Added)
-
30.52A.152, Repairs (IBC 105.2.2)
(Added)
-
30.52A.154, Public service agencies (IBC 105.2.3)
(Added)
-
30.52A.156, Application for permit, permit processing and notice (IBC 105.3)
(Added)
-
30.52A.158, Action on application (IBC 105.3.1)
(Added)
-
30.52A.160, Time limitation of application (IBC 105.3.2)
(Added)
-
30.52A.162, Validity of permit (IBC 105.4)
(Added)
-
30.52A.164, Expiration (IBC 105.5)
(Added)
-
30.52A.166, Suspension or revocation (IBC 105.6)
(Added)
-
30.52A.167, Placement of permit (IBC 105.7)
(Added)
-
30.52A.171, Submittal documents (IBC 107.1)
(Added)
-
30.52A.172, Information on construction documents shall be in accordance with sections 107.2.1 through 107.2.5 (IBC 107.2.1)
(Added)
-
30.52A.174, Fire protection system shop drawings (IBC 107.2.2)
(Added)
-
30.52A.176, Means of egress (IBC 107.2.3)
(Added)
-
30.52A.178, Exterior wall envelope (IBC 107.2.4)
(Added)
-
30.52A.180, Site plan (IBC 107.2.5)
(Added)
-
30.52A.182, Examination of documents (IBC 107.3)
(Added)
-
30.52A.184, Approval of construction documents (IBC 107.3.1)
(Added)
-
30.52A.188, Phased approval (IBC 107.3.3)
(Added)
-
30.52A.190, Design professional in responsible charge - general (IBC 107.3.4.1)
(Added)
-
30.52A.192, Deferred submittals (IBC 107.3.4.2)
(Added)
-
30.52A.194, Amended construction documents (IBC 107.4)
(Added)
-
30.52A.196, Retention of construction documents (IBC 107.5)
(Added)
-
30.52A.198, Temporary structures and uses - general (IBC 108.1)
(Added)
-
30.52A.200, Conformance (IBC 108.2)
(Added)
-
30.52A.202, Termination of approval (IBC 108.4)
(Added)
-
30.52A.204, Fees and payment of fees (IBC 109.1)
(Added)
-
30.52A.206, Schedule of permit fees (IBC 109.2)
(Added)
-
30.52A.208, Building permit valuations (IBC 109.3)
(Added)
-
30.52A.210, Work commencing before permit issuance (IBC 109.4)
(Added)
-
30.52A.212, Related fees (IBC 109.5)
(Added)
-
30.52A.214, Refunds (IBC 109.6)
(Added)
-
30.52A.216, Inspections - general (IBC 110.1)
(Added)
-
30.52A.218, Preliminary inspection (IBC 110.2)
(Added)
-
30.52A.220, Required inspections (IBC 110.3)
(Added)
-
30.52A.222, Footing and foundation inspection (IBC 110.3.1)
(Added)
-
30.52A.224, Concrete slab and under-floor inspection (IBC 110.3.2)
(Added)
-
30.52A.226, Lowest floor elevation (IBC 110.3.3)
(Added)
-
30.52A.228, Frame inspection (IBC 110.3.4)
(Added)
-
30.52A.230, Lath and gypsum board inspection (IBC 110.3.5)
(Added)
-
30.52A.232, Fire- and smoke-resistant penetrations (IBC 110.3.6)
(Added)
-
30.52A.234, Energy efficiency inspections (IBC 110.3.7)
(Added)
-
30.52A.236, Other inspections (IBC 110.3.8)
(Added)
-
30.52A.238, Special inspections (IBC 110.3.9)
(Added)
-
30.52A.240, Final inspection (IBC 110.3.10)
(Added)
-
30.52A.242, Inspection agencies (IBC 110.4)
(Added)
-
30.52A.244, Inspection requests (IBC 110.5)
(Added)
-
30.52A.246, Approval required (IBC 110.6)
(Added)
-
30.52A.248, Certificate of occupancy (IBC 111.1)
(Added)
-
30.52A.250, Certificate issued (IBC 111.2)
(Added)
-
30.52A.252, Temporary occupancy (IBC 111.3)
(Added)
-
30.52A.254, Revocation (IBC 111.4)
(Added)
-
30.52A.256, Service utilities and connection of service utilities (IBC 112.1)
(Added)
-
30.52A.258, Temporary connection (IBC 112.2)
(Added)
-
30.52A.260, Authority to disconnect service utilities (IBC 112.3)
(Added)
-
30.52A.262, Unlawful acts/violations (IBC 114.1)
(Added)
-
30.52A.264, Notice of violation (IBC 114.2)
(Added)
-
30.52A.268, Prosecution of violation (IBC 114.3)
(Added)
-
30.52A.270, Violation penalties (IBC 114.4)
(Added)
-
30.52A.272, Stop work order authority (IBC 115.1)
(Added)
-
30.52A.274, Issuance (IBC 115.2)
(Added)
-
30.52A.276, Unlawful continuance (IBC 115.3)
(Added)
-
30.52A.278, Conditions for unsafe structures and equipment (IBC 116.1)
(Added)
-
30.52A.280, Record (IBC 116.2)
(Added)
-
30.52A.282, Notice (IBC 116.3)
(Added)
-
30.52A.284, Method of service (IBC 116.4)
(Added)
-
30.52A.286, Restoration (IBC 116.5)
(Added)
-
30.52A.304, Amendment to section 3412.2 of the IBC (IBC 3412.2)
(Added)