Skip to main content
Loading…
This section is included in your selections.

The county road engineer is authorized to require that all water lines to be installed along county road rights-of-way be not less than six inches in diameter, and shall be, insofar as possible, designed to provide a capacity capable of supplying the present and potential needs of the area to be served. (Amended by Res. adopted May 18, 1970).