Skip to main content
Loading…
This section is included in your selections.

"Targeted stormwater site plan" means a comprehensive report containing all of the technical information and analysis necessary for the evaluation of a proposed new development or redevelopment project’s compliance with the county’s stormwater regulations and which includes drainage reports, plans, designs and when applicable, calculations, prepared by the applicant to comply with minimum requirements 1 through 5 described in chapter 30.63A SCC and the Drainage Manual. The targeted plan may address compliance with minimum requirements 6 through 8 based on the results of the hydrologic analysis required under minimum requirement 1 and the scope of the proposed project, or for phased submittal of a full stormwater drainage plan subject to a public hearing and a Type 2 hearing examiner decision. (Added by Amended Ord. 10-026, June 9, 2010, Eff date Sept. 30, 2010; Amended by Ord. 15-103, Jan. 11, 2016, Eff date Jan. 22, 2016).