Skip to main content
Loading…
This section is included in your selections.

Table 30.86.100 Subdivision Fees

OTHER FEES: All necessary fees for subdivision approval/recording are not listed here. Examples of fees not collected by the department include: (1) Applicable private well and septic system approvals (county health department); (2) right-of-way permit (department/department of public works), see SCC 13.110.020; and (3) subdivision recording fees (auditor).

PRE-APPLICATION CONFERENCE FEE

$480

PRELIMINARY SUBDIVISION FILING FEE (1), (2)

Base fee

$4,680

Plus $ per lot

$132

Plus $ per acre

$78

Total maximum fee

$21,600

SUBDIVISION MODIFICATIONS

$1,200

REVISIONS TO APPROVED PRELIMINARY SUBDIVISIONS

Minor revision-administrative

$312

Major revision-public hearing

$1,248

CONSTRUCTION PLAN CHECK FEE (3)

Per lot (4)

$192

Per tract or non-building lot

$192

ROAD INSPECTION FEE

Per lot (4)

$192

Per tract or non-building lot

$192

FINAL SUBDIVISION FEES

Filing fee

$2,400

Document check and sign installation fee

$264/lot and unit cost/sign required

ROAD SECURITY DEVICE ADMINISTRATION FEE (5)

Performance security option (6)

$24.50/Lot

Maintenance security (7)

$31.00/Lot

"MARKUP" CORRECTIONS FEE (8)

$240

SUBDIVISION ALTERATION

PLACEHOLDER POSITION

MODEL HOME FEES (9)

Base fee

$360

Plus $ per subdivision

NOTE: For reference notes, see table following SCC 30.86.110.

120

PRELIMINARY SUBDIVISION EXTENSION (10)

$500

Reference notes for subdivision fee tables:

(1) A preliminary filing fee consists of the sum of a base fee, a per lot fee, a per acre fee, and a supplemental fee if applicable.

(2) When a preliminary subdivision application is considered in conjunction with a rezone for the same property, the total preliminary subdivision fee shall be reduced by 25 percent. If a preliminary subdivision application is considered in conjunction with a planned residential development, with or without a rezone, the total preliminary subdivision fee shall be reduced by 50 percent. The sum of the above fees shall be limited to $16,800.

(3) Collected when the preliminary subdivision applicant submits the construction plan.

(4) When three or more contiguous lots are to be developed with a single townhouse building (zero lot line construction), then a plan check fee of $192.00 per building will be charged and the plan check or inspection fee will not be based on the number of lots.

(5) Paid by the applicant to cover the costs of administering security devices as provided by chapter 30.84 SCC.

(6) This fee applies if the developer elects to carry out minimum improvements using the provisions of SCC 30.41A.410(1)(b) before requesting final approval, and is in addition to subsequent subdivision road inspection fees.

(7) Collected in accordance with SCC 30.41A.410(2).

(8) This fee applies whenever an applicant fails to submit required corrections noted on "markup" final subdivision drawings or other documents during the final subdivision review.

(9) This fee is in addition to the residential building permit fees for plan check, site review and access permit.

(10) This fee applies to preliminary subdivision approval extensions pursuant to SCC Table 30.70.140(1).

(Added by Amended Ord. 02-064, Dec. 9, 2002, Eff date Feb. 1, 2003; Amended by Amended Ord. 07-108, Nov. 19, 2007, Eff date July 1, 2008; Amended by Amended Ord. 09-018, June 3, 2009, Eff date June 25, 2009; Amended by Amended Ord. 10-086, Oct. 20, 2010, Eff date Nov. 4, 2010; Amended by Ord. 15-005, Mar. 18, 2015, Eff date Apr. 2, 2015; Amended by Amended Ord. 16-004, Mar. 16, 2016, Eff date Apr. 1, 2016; Amended by Amended Ord. 22-062, Oct. 26, 2022, Eff date Jan. 1, 2023).