Skip to main content
Loading…
This section is included in your selections.

When minimum requirement 3 applies pursuant to part 300 of this chapter and no exemption under SCC 30.63A.200 applies, source control shall be provided through the application of source control BMPs during construction and on the developed site following construction. BMPs shall be appropriate for the proposed construction activities, buildings, facilities and intended post-development site uses in accordance with volume IV of the Drainage Manual. All known, available and reasonable source control BMPs shall be required as follows:

(1) Source control BMPs in accordance with volume IV, chapters 3 and 4 of the Drainage Manual shall be applied during construction if any pollution-generating activities described in volume IV, chapters 3 and 4 are performed on the site during construction; and

(2) Source control BMPs in accordance with volume IV, chapter 5 of the Drainage Manual shall be selected, designed, and constructed if any pollution-generating activities or uses described in volume IV, chapter 5 are proposed for the developed site following construction. (Added by Amended Ord. 10-026, June 9, 2010, Eff date Sept. 30, 2010).