Skip to main content
Loading…
This section is included in your selections.

To determine the acceptability of technologies, processes, products, facilities, materials and uses attending the design, operation or use of a building or premises subject to inspection by the fire marshal, the fire marshal is authorized to require the owner or agent to provide, without charge to Snohomish County, a technical opinion and report. The opinion and report shall be prepared by a qualified engineer, specialist, and laboratory or fire safety specialty organization acceptable to the fire marshal and shall analyze the fire safety properties of the design, operation or use of the building or premises and the facilities and appurtenances situated thereon, to recommend necessary changes. The fire marshal is authorized to require design submittals to be prepared by, and bear the stamp of, a registered design professional. (Added by Ord. 07-087, Sept. 5, 2007, Eff date Sept. 21, 2007; Amended by Amended Ord. 14-059, Aug. 27, 2014, Eff date Sept. 13, 2014).