Skip to main content
Loading…
This section is included in your selections.

Inspection of framing and masonry construction shall be made after the roof, masonry, all framing, fire stopping, drafts topping and bracing are in place and after the plumbing, mechanical and electrical rough inspections are approved. (Added by Amended Ord. 14-060, Aug. 27, 2014, Eff date Sept. 13, 2014).