Skip to main content
Loading…
This section is included in your selections.

Rough inspection of plumbing, mechanical, gas and electrical systems shall be made prior to covering or concealment, before fixtures or appliances are set or installed, and prior to framing inspection.

Exception. Back-filling of ground-source heat pump loop systems tested in accordance with section M2105.1 of the IRC prior to inspection shall be permitted. (Added by Amended Ord. 14-060, Aug. 27, 2014, Eff date Sept. 13, 2014).