Skip to main content
Loading…
This section is included in your selections.

Submittal documents consisting of construction documents and other data shall be submitted in two or more sets, or in a digital format where allowed by the building official, with each application for a permit. The construction documents shall be prepared by a registered design professional where required by title 30 SCC. Where special conditions exist, the building official is authorized to require additional construction documents to be prepared by a registered design professional.

Exception. The building official is authorized to waive the submission of construction documents and other data not required to be prepared by a registered design professional if it is found that the nature of the work applied for is such that reviewing of construction documents is not necessary to obtain compliance with the residential code. (Added by Amended Ord. 14-060, Aug. 27, 2014, Eff date Sept. 13, 2014; Amended by Ord. 21-030, July 14, 2021, Eff date July 25, 2021).