Skip to main content
Loading…
This section is included in your selections.

(1) Basic lot yield shall be obtained by dividing the gross site area by the larger of 200,000 square feet or the minimum required lot area of the zone in which the rural cluster subdivision or short subdivision is to be located (with both numbers expressed in the same units).

(2) The maximum lot yield shall be obtained by multiplying the basic lot yield by one plus the density bonus, expressed as a fraction, as specified in SCC 30.41C.240.

(3) In determining the lot yield, a designated duplex lot shall be considered as two lots.

(4) Whenever the resulting yield results in a fractional equivalent of 0.5 or more, the yield shall be rounded up to the next whole number; fractions of less than 0.5 shall be rounded down. (Added by Amended Ord. 02-064, Dec. 9, 2002, Eff date Feb. 1, 2003; Amended by Amended Ord. 05-083, Dec. 21, 2005, Eff date Feb. 1, 2006; Amended by Amended Ord. 08-087, Feb. 4, 2009, Eff date Apr. 5, 2009; Amended by Amended Ord. 09-046, Aug. 12, 2009, Eff date Sept. 10, 2009).