The following construction drawings, plans, and evidence shall be prepared and submitted either at the time of consideration of the preliminary subdivision or prior to construction. Plan submittal requirements shall be detailed by the department and available in checklist form:

(1) A full drainage plan shall be submitted as per chapter 30.63A SCC;

(2) A construction plan shall be submitted complying with the EDDS; and

(3) The full drainage plan and construction plan as specified above shall be reviewed under the direction of and approved by a registered professional engineer qualified in civil engineering assigned to the department. (Added by Amended Ord. 02-064, Dec. 9, 2002, Eff date Feb. 1, 2003).