Skip to main content
Loading…
This section is included in your selections.

Access to lots within a proposed BLA shall meet the requirements in this section.

(1) Lots created through a subdivision, short subdivision, or binding site plan that are included in a proposed BLA shall meet all requirements of this chapter except SCC 30.24.040, 30.24.070, 30.24.080, 30.24.140 and 30.24.150.

(2) Lots not created through a subdivision, short subdivision, or binding site plan that are included in a proposed BLA shall meet all requirements of this chapter except SCC 30.24.010(7) and (8), 30.24.070, 30.24.080, 30.24.140 and 30.24.150.

(3) Any new primary access shall be constructed from the nearest open, constructed and maintained public or private road prior to recording of the BLA when:

(a) The access will be from a new or different road network element;

(b) The BLA involves three or more lots; and

(c) The access is not constructed to a standard determined appropriate by the county engineer for the existing and anticipated traffic volumes to be generated by the lots reconfigured in the BLA. (Added by Amended Ord. 12-049, Oct. 3, 2012, Eff date Jan. 1, 2013).