Skip to main content
Loading…
This section is included in your selections.

(1) A Type B5 permit authorizes traffic control measures during specified dates and time periods. A Type B5 permit does not authorize physical disturbance of the surface of the roadway, shoulders, ditches, cuts, slopes or other portions of the right-of-way; instead, such disturbance may be authorized by a Type D permit pursuant to chapter 13.60 SCC.

(2) A Type B5 permit may be revised to include multiple date and time periods during the life of the permit.

(3) The traffic control activities identified in a Type B5 permit are authorized only during those specific dates and times listed in the permit, including any revisions to or extension of such permit.

(4) A permittee must submit a request to revise a Type B5 permit to add an additional date and/or time period at least 2 days in advance of the date and time requested. A longer period of advance notice may be required by the department depending on the extent of the requested revision.

(5) Should a permittee desire an alteration to or extension of an approved date and time period listed in a Type B5 permit, the permittee must obtain department approval of such change in advance of the original date and time specified in the permit.

(6) All traffic control measures shall comply with the EDDS and the MUTCD. (Added by Amended Ord. 12-001, Feb. 15, 2012, Eff date Feb. 26, 2012).