Skip to main content
Loading…
This section is included in your selections.

(1) Traffic control, including detours required on or approaching any site subject to a permit/ franchise shall be in accordance with the EDDS and the current edition of the MUTCD. The engineer may require an applicant to obtain a traffic control (Type B5) permit in accordance with chapter 13.40 SCC where required to protect vehicular or pedestrian traffic or county property.

(2) The department may require an applicant to submit a traffic control plan showing the proposed traffic control and detour routing including location and type of warning lights, safety devices, signs and barricades intended to protect vehicular or pedestrian traffic at the site of the proposed use. The department shall approve the traffic control plan before issuing a permit.

(3) All decisions of the department shall be final in all matters pertaining to the number, type, locations, installation and maintenance of warning and safety devices or use of detours in the right-of-way during any work or activity for which a duly authorized permit has been issued. (Added by Ord. 85-051 § 3, July 3, 1985; Amended by Ord. 96-028 § 21, June 12, 1996, Eff date June 29, 1996).